Latest news:

[ 02/15/10 ]  BC Hydro awarded CES Analytics Ltd.  a contract to provide Continuous Optimization Services for the Rocky Mountain School District

[ 03/08/10 ]  Vancouver Coastal Health awarded CES Analytics Ltd. a contract to conduct a Peer Review of the Mechanical Systems Design of the Robert Ho Research Building

Current projects:

BC Housing  Boiler Retrofit Projects incuding DDC System Design, Commissioning, Measurement and Verification of Energy Use at Sunset Towers, Hall Tower, Laurelynn Place, Steeves Manor and Len Shepherd Manor.

This text is replaced by the Flash movie.

Total Building Commissioning, Performance Measurement & Verification, Energy Systems Retrofit Design and Building Systems “Forensic” Engineering interact synergistically facilitating an holistic approach to building systems commissioning.

Boban Ratkovich, P. Eng, CEM, LEED AP, Principal
CES Group